Construction Industry Survey (15/49)
KOSIS 调查「Construction Industry Survey」的 2 张统计表、151 个项目,以年度数值与图表呈现。
공사지역/공사종류별 수주액,기성액,미기성액(해외건설)
回到顶部공사종류별 총계 · 공사지역별 총계
- Value of orders received
- Building construction Value of orders received
- Detached & tenement house Value of orders received
- High-rise apartment(6~15 floor) Value of orders received
- APT(16 floor or more) Value of orders received
- Residential shop Value of orders received
- Market department store Value of orders received
- Office building Value of orders received
- Public building(less than 11th floor) Value of orders received
- Hotel & lodgings Value of orders received
- Educational facilities Value of orders received
- Hospital Value of orders received
- Public & Performance Value of orders received
- Stadium & playground Value of orders received
- Exhibition pavilion Value of orders received
- Factory & workshop Value of orders received
- Machine installation (except plant) Value of orders received
- Value of construction completed
- Building construction Value of construction completed
- Detached & tenement house Value of construction completed
- Low-rise apartment(less than 5th floor) Value of construction completed
- High-rise apartment(6~15 floor) Value of construction completed
- APT(16 floor or more) Value of construction completed
- Residential shop Value of construction completed
- Market department store Value of construction completed
- Office building Value of construction completed
- Intelligent building Value of construction completed
- Public building(less than 11th floor) Value of construction completed
- Hotel & lodgings Value of construction completed
- Educational facilities Value of construction completed
- Hospital Value of construction completed
- Public & Performance Value of construction completed
- Stadium & playground Value of construction completed
- Exhibition pavilion Value of construction completed
- Factory & workshop Value of construction completed
- Machine installation (except plant) Value of construction completed
- Value of construction completed in original contract
- Building construction Value of construction completed in original contract
- Detached & tenement house Value of construction completed in original contract
- Low-rise apartment(less than 5th floor) Value of construction completed in original contract
- High-rise apartment(6~15 floor) Value of construction completed in original contract
- APT(16 floor or more) Value of construction completed in original contract
- Residential shop Value of construction completed in original contract
- Market department store Value of construction completed in original contract
- Office building Value of construction completed in original contract
- Intelligent building Value of construction completed in original contract
- Public building(less than 11th floor) Value of construction completed in original contract
- Hotel & lodgings Value of construction completed in original contract
- Educational facilities Value of construction completed in original contract
- Hospital Value of construction completed in original contract
- Public & Performance Value of construction completed in original contract
- Stadium & playground Value of construction completed in original contract
- Exhibition pavilion Value of construction completed in original contract
- Factory & workshop Value of construction completed in original contract
- Machine installation (except plant) Value of construction completed in original contract
- Value of construction completed in subcontract
- Building construction Value of construction completed in subcontract
- Market department store Value of construction completed in subcontract
- Office building Value of construction completed in subcontract
- Hotel & lodgings Value of construction completed in subcontract
- Stadium & playground Value of construction completed in subcontract
- Exhibition pavilion Value of construction completed in subcontract
- Factory & workshop Value of construction completed in subcontract
- Machine installation (except plant) Value of construction completed in subcontract
- Value of carry-over work
- Building construction Value of carry-over work
- Detached & tenement house Value of carry-over work
- Low-rise apartment(less than 5th floor) Value of carry-over work
- High-rise apartment(6~15 floor) Value of carry-over work
- APT(16 floor or more) Value of carry-over work
- Residential shop Value of carry-over work
- Market department store Value of carry-over work
- Office building Value of carry-over work
- Public building(less than 11th floor) Value of carry-over work
- Hotel & lodgings Value of carry-over work
- Educational facilities Value of carry-over work
- Hospital Value of carry-over work
- Public & Performance Value of carry-over work
- Stadium & playground Value of carry-over work
- Exhibition pavilion Value of carry-over work
- Factory & workshop Value of carry-over work
- Machine installation (except plant) Value of carry-over work
Value of orders received
1994 5,458,660Million Won→2007 28,248,510Million Won▲ +417.5%
Building construction Value of orders received
1994 2,216,041Million Won→2007 8,268,802Million Won▲ +273.1%
Detached & tenement house Value of orders received
1994 187,335Million Won→2007 447Million Won▼ −99.8%
High-rise apartment(6~15 floor) Value of orders received
1994 75,889Million Won→2007 1,644,140Million Won▲ +2066.5%
APT(16 floor or more) Value of orders received
1994 152,711Million Won→2007 1,867,464Million Won▲ +1122.9%
Residential shop Value of orders received
1994 407,490Million Won→2007 270,438Million Won▼ −33.6%
Market department store Value of orders received
1994 3,205Million Won→2007 722,756Million Won▲ +22450.9%
Office building Value of orders received
1994 129,934Million Won→2007 537,731Million Won▲ +313.8%
Public building(less than 11th floor) Value of orders received
1994 47,717Million Won→2007 31,487Million Won▼ −34.0%
Hotel & lodgings Value of orders received
1994 39,988Million Won→2007 764,629Million Won▲ +1812.1%
Educational facilities Value of orders received
1994 50,667Million Won→2007 100,241Million Won▲ +97.8%
Hospital Value of orders received
1994 241,447Million Won→2007 9,318Million Won▼ −96.1%
Public & Performance Value of orders received
1994 1,028Million Won→2007 13,203Million Won▲ +1184.3%
Stadium & playground Value of orders received
1994 21,294Million Won→2007 1,019Million Won▼ −95.2%
Exhibition pavilion Value of orders received
1997 126,958Million Won→2007 68,090Million Won▼ −46.4%
Factory & workshop Value of orders received
1994 513,811Million Won→2007 1,597,297Million Won▲ +210.9%
Machine installation (except plant) Value of orders received
1994 153,493Million Won→2007 23,936Million Won▼ −84.4%
Value of construction completed
1994 3,385,170Million Won→2007 16,138,691Million Won▲ +376.7%
Building construction Value of construction completed
1994 1,163,529Million Won→2007 3,190,523Million Won▲ +174.2%
Detached & tenement house Value of construction completed
1994 15,970Million Won→2007 12,627Million Won▼ −20.9%
Low-rise apartment(less than 5th floor) Value of construction completed
1994 61,277Million Won→2007 15,736Million Won▼ −74.3%
High-rise apartment(6~15 floor) Value of construction completed
1994 103,288Million Won→2007 54,237Million Won▼ −47.5%
APT(16 floor or more) Value of construction completed
1994 71,073Million Won→2007 116,421Million Won▲ +63.8%
Residential shop Value of construction completed
1994 45,249Million Won→2007 250,078Million Won▲ +452.7%
Market department store Value of construction completed
1994 17,191Million Won→2007 71,777Million Won▲ +317.5%
Office building Value of construction completed
1994 154,294Million Won→2007 54,104Million Won▼ −64.9%
Intelligent building Value of construction completed
1997 67,981Million Won→2007 94,205Million Won▲ +38.6%
Public building(less than 11th floor) Value of construction completed
1994 276,501Million Won→2007 29,660Million Won▼ −89.3%
Hotel & lodgings Value of construction completed
1994 34,472Million Won→2007 136,470Million Won▲ +295.9%
Educational facilities Value of construction completed
1994 20,834Million Won→2007 45,062Million Won▲ +116.3%
Hospital Value of construction completed
1994 95,515Million Won→2007 20,253Million Won▼ −78.8%
Public & Performance Value of construction completed
1994 5,642Million Won→2007 25,153Million Won▲ +345.8%
Stadium & playground Value of construction completed
1994 1,093Million Won→2007 2,423Million Won▲ +121.7%
Exhibition pavilion Value of construction completed
1997 7,607Million Won→2007 35,551Million Won▲ +367.3%
Factory & workshop Value of construction completed
1994 100,090Million Won→2007 1,600,823Million Won▲ +1499.4%
Machine installation (except plant) Value of construction completed
1994 77,385Million Won→2007 10,709Million Won▼ −86.2%
Value of construction completed in original contract
1994 3,174,994Million Won→2007 15,454,725Million Won▲ +386.8%
Building construction Value of construction completed in original contract
1994 1,090,574Million Won→2007 2,997,276Million Won▲ +174.8%
Detached & tenement house Value of construction completed in original contract
1994 15,970Million Won→2007 11,756Million Won▼ −26.4%
Low-rise apartment(less than 5th floor) Value of construction completed in original contract
1994 59,619Million Won→2007 9,212Million Won▼ −84.5%
High-rise apartment(6~15 floor) Value of construction completed in original contract
1994 103,288Million Won→2007 39,575Million Won▼ −61.7%
APT(16 floor or more) Value of construction completed in original contract
1994 71,073Million Won→2007 93,133Million Won▲ +31.0%
Residential shop Value of construction completed in original contract
1994 45,249Million Won→2007 218,375Million Won▲ +382.6%
Market department store Value of construction completed in original contract
1994 17,175Million Won→2007 71,373Million Won▲ +315.6%
Office building Value of construction completed in original contract
1994 151,628Million Won→2007 47,188Million Won▼ −68.9%
Intelligent building Value of construction completed in original contract
1997 62,198Million Won→2007 94,205Million Won▲ +51.5%
Public building(less than 11th floor) Value of construction completed in original contract
1994 276,501Million Won→2007 24,846Million Won▼ −91.0%
Hotel & lodgings Value of construction completed in original contract
1994 34,472Million Won→2007 130,178Million Won▲ +277.6%
Educational facilities Value of construction completed in original contract
1994 20,834Million Won→2007 27,900Million Won▲ +33.9%
Hospital Value of construction completed in original contract
1994 95,515Million Won→2007 19,532Million Won▼ −79.6%
Public & Performance Value of construction completed in original contract
1994 5,642Million Won→2007 23,045Million Won▲ +308.5%
Stadium & playground Value of construction completed in original contract
1994 1,093Million Won→2007 2,093Million Won▲ +91.5%
Exhibition pavilion Value of construction completed in original contract
1997 7,607Million Won→2007 27,696Million Won▲ +264.1%
Factory & workshop Value of construction completed in original contract
1994 98,958Million Won→2007 1,563,462Million Won▲ +1479.9%
Machine installation (except plant) Value of construction completed in original contract
1994 32,345Million Won→2007 1,710Million Won▼ −94.7%
Value of construction completed in subcontract
1994 210,175Million Won→2007 683,966Million Won▲ +225.4%
Building construction Value of construction completed in subcontract
1994 72,954Million Won→2007 193,247Million Won▲ +164.9%
Market department store Value of construction completed in subcontract
1994 15Million Won→2007 404Million Won▲ +2593.3%
Office building Value of construction completed in subcontract
1994 2,665Million Won→2007 6,915Million Won▲ +159.5%
Hotel & lodgings Value of construction completed in subcontract
1995 329Million Won→2007 6,292Million Won▲ +1812.5%
Stadium & playground Value of construction completed in subcontract
1996 1,148Million Won→2007 330Million Won▼ −71.3%
Exhibition pavilion Value of construction completed in subcontract
1998 11Million Won→2007 7,854Million Won▲ +71300.0%
Factory & workshop Value of construction completed in subcontract
1994 1,131Million Won→2007 37,361Million Won▲ +3203.4%
Machine installation (except plant) Value of construction completed in subcontract
1994 45,039Million Won→2007 8,999Million Won▼ −80.0%
Value of carry-over work
1994 8,070,631Million Won→2007 41,626,878Million Won▲ +415.8%
Building construction Value of carry-over work
1994 3,438,653Million Won→2007 10,982,093Million Won▲ +219.4%
Detached & tenement house Value of carry-over work
1994 191,661Million Won→2007 16,874Million Won▼ −91.2%
Low-rise apartment(less than 5th floor) Value of carry-over work
1994 73,749Million Won→2007 12,306Million Won▼ −83.3%
High-rise apartment(6~15 floor) Value of carry-over work
1994 137,605Million Won→2007 1,657,366Million Won▲ +1104.4%
APT(16 floor or more) Value of carry-over work
1994 305,963Million Won→2007 2,041,724Million Won▲ +567.3%
Residential shop Value of carry-over work
1994 762,442Million Won→2007 900,144Million Won▲ +18.1%
Market department store Value of carry-over work
1994 7,824Million Won→2007 695,603Million Won▲ +8790.6%
Office building Value of carry-over work
1994 401,162Million Won→2007 547,251Million Won▲ +36.4%
Public building(less than 11th floor) Value of carry-over work
1994 115,026Million Won→2007 30,691Million Won▼ −73.3%
Hotel & lodgings Value of carry-over work
1994 52,950Million Won→2007 1,147,480Million Won▲ +2067.1%
Educational facilities Value of carry-over work
1994 156,336Million Won→2007 84,897Million Won▼ −45.7%
Hospital Value of carry-over work
1994 467,687Million Won→2007 153,960Million Won▼ −67.1%
Public & Performance Value of carry-over work
1994 34,698Million Won→2007 23,331Million Won▼ −32.8%
Stadium & playground Value of carry-over work
1994 30,228Million Won→2007 605Million Won▼ −98.0%
Exhibition pavilion Value of carry-over work
1997 119,379Million Won→2007 33,885Million Won▼ −71.6%
Factory & workshop Value of carry-over work
1994 493,327Million Won→2007 1,753,363Million Won▲ +255.4%
Machine installation (except plant) Value of carry-over work
1994 97,970Million Won→2007 18,958Million Won▼ −80.6%
공사지역/등록업종별 수주액,기성액,미기성액(해외건설)
回到顶部등록업종별 합계 · 공사지역별 총계
- Total Value of orders received
- General construction Value of orders received
- Special construction Value of orders received
- Interior architecture works Value of orders received
- Excavating and earthmoving Value of orders received
- Plastering waterproofing masonry construction business Value of orders received
- Stone works Value of orders received
- Painting works Value of orders received
- Scaffolding demolition works Value of orders received
- Metal structure installation and Erection of doors Value of orders received
- Roofing sheet metal prefabrication Value of orders received
- Steel Reinforcing and Reinforced Concrete Works Value of orders received
- Water supply & sewerages Value of orders received
- Boring & gronting works Value of orders received
- Steel frame works Value of orders received
- Total Value of construction completed
- General construction Value of construction completed
- Special construction Value of construction completed
- Interior architecture works Value of construction completed
- Excavating and earthmoving Value of construction completed
- Plastering waterproofing masonry construction business Value of construction completed
- Stone works Value of construction completed
- Painting works Value of construction completed
- Scaffolding demolition works Value of construction completed
- Metal structure installation and Erection of doors Value of construction completed
- Roofing sheet metal prefabrication Value of construction completed
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed
- Water supply & sewerages Value of construction completed
- Boring & gronting works Value of construction completed
- Steel frame works Value of construction completed
- Total Value of construction completed in original contract
- General construction Value of construction completed in original contract
- Special construction Value of construction completed in original contract
- Interior architecture works Value of construction completed in original contract
- Painting works Value of construction completed in original contract
- Scaffolding demolition works Value of construction completed in original contract
- Metal structure installation and Erection of doors Value of construction completed in original contract
- Roofing sheet metal prefabrication Value of construction completed in original contract
- Water supply & sewerages Value of construction completed in original contract
- Boring & gronting works Value of construction completed in original contract
- Total Value of construction completed in subcontract
- General construction Value of construction completed in subcontract
- Special construction Value of construction completed in subcontract
- Interior architecture works Value of construction completed in subcontract
- Excavating and earthmoving Value of construction completed in subcontract
- Plastering waterproofing masonry construction business Value of construction completed in subcontract
- Stone works Value of construction completed in subcontract
- Painting works Value of construction completed in subcontract
- Scaffolding demolition works Value of construction completed in subcontract
- Metal structure installation and Erection of doors Value of construction completed in subcontract
- Roofing sheet metal prefabrication Value of construction completed in subcontract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
- Water supply & sewerages Value of construction completed in subcontract
- Boring & gronting works Value of construction completed in subcontract
- Steel frame works Value of construction completed in subcontract
- Total Value of carry-over work
- General construction Value of carry-over work
- Special construction Value of carry-over work
- Interior architecture works Value of carry-over work
- Excavating and earthmoving Value of carry-over work
- Plastering waterproofing masonry construction business Value of carry-over work
- Painting works Value of carry-over work
- Scaffolding demolition works Value of carry-over work
- Metal structure installation and Erection of doors Value of carry-over work
- Roofing sheet metal prefabrication Value of carry-over work
- Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
- Water supply & sewerages Value of carry-over work
- Boring & gronting works Value of carry-over work
- Steel frame works Value of carry-over work
Total Value of orders received
1994 5,458,660Million Won→2007 28,248,510Million Won▲ +417.5%
General construction Value of orders received
1994 5,311,712Million Won→2007 27,044,789Million Won▲ +409.2%
Special construction Value of orders received
1994 10,806Million Won→2007 699,308Million Won▲ +6371.5%
Interior architecture works Value of orders received
1994 1,774Million Won→2007 78,150Million Won▲ +4305.3%
Excavating and earthmoving Value of orders received
1995 17,900Million Won→2007 52,715Million Won▲ +194.5%
Plastering waterproofing masonry construction business Value of orders received
1994 420Million Won→2007 1,257Million Won▲ +199.3%
Stone works Value of orders received
1995 1,241Million Won→2007 629Million Won▼ −49.3%
Painting works Value of orders received
1994 1,669Million Won→2007 616Million Won▼ −63.1%
Scaffolding demolition works Value of orders received
1994 5,193Million Won→2007 855Million Won▼ −83.5%
Metal structure installation and Erection of doors Value of orders received
1994 822Million Won→2007 22,689Million Won▲ +2660.2%
Roofing sheet metal prefabrication Value of orders received
1995 760Million Won→2007 7,260Million Won▲ +855.3%
Steel Reinforcing and Reinforced Concrete Works Value of orders received
1997 40Million Won→2007 62,505Million Won▲ +156162.5%
Water supply & sewerages Value of orders received
1995 203Million Won→2007 7,328Million Won▲ +3509.9%
Boring & gronting works Value of orders received
1995 86Million Won→2007 222,877Million Won▲ +259059.3%
Steel frame works Value of orders received
1994 926Million Won→2007 39,731Million Won▲ +4190.6%
Total Value of construction completed
1994 3,385,170Million Won→2007 16,138,691Million Won▲ +376.7%
General construction Value of construction completed
1994 3,159,627Million Won→2007 14,998,954Million Won▲ +374.7%
Special construction Value of construction completed
1994 10,409Million Won→2007 497,202Million Won▲ +4676.7%
Interior architecture works Value of construction completed
1994 3,663Million Won→2007 83,400Million Won▲ +2176.8%
Excavating and earthmoving Value of construction completed
1994 9Million Won→2007 33,032Million Won▲ +366922.2%
Plastering waterproofing masonry construction business Value of construction completed
1994 420Million Won→2007 4,812Million Won▲ +1045.7%
Stone works Value of construction completed
1995 203Million Won→2007 5,235Million Won▲ +2478.8%
Painting works Value of construction completed
1994 1,658Million Won→2007 2,248Million Won▲ +35.6%
Scaffolding demolition works Value of construction completed
1994 2,385Million Won→2007 5,875Million Won▲ +146.3%
Metal structure installation and Erection of doors Value of construction completed
1994 386Million Won→2007 29,018Million Won▲ +7417.6%
Roofing sheet metal prefabrication Value of construction completed
1995 760Million Won→2007 6,316Million Won▲ +731.1%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed
1995 863Million Won→2007 27,401Million Won▲ +3075.1%
Water supply & sewerages Value of construction completed
1995 203Million Won→2007 5,019Million Won▲ +2372.4%
Boring & gronting works Value of construction completed
1994 1,212Million Won→2007 141,451Million Won▲ +11570.9%
Steel frame works Value of construction completed
1994 671Million Won→2007 20,239Million Won▲ +2916.2%
Total Value of construction completed in original contract
1994 3,174,994Million Won→2007 15,454,725Million Won▲ +386.8%
General construction Value of construction completed in original contract
1994 2,956,978Million Won→2007 14,704,701Million Won▲ +397.3%
Special construction Value of construction completed in original contract
1994 4,607Million Won→2007 193,593Million Won▲ +4102.1%
Interior architecture works Value of construction completed in original contract
1994 3,648Million Won→2007 61,548Million Won▲ +1587.2%
Painting works Value of construction completed in original contract
1995 24Million Won→2007 32Million Won▲ +33.3%
Scaffolding demolition works Value of construction completed in original contract
1994 151Million Won→2007 147Million Won▼ −2.6%
Metal structure installation and Erection of doors Value of construction completed in original contract
1994 386Million Won→2007 8,106Million Won▲ +2000.0%
Roofing sheet metal prefabrication Value of construction completed in original contract
1995 148Million Won→2007 4,031Million Won▲ +2623.6%
Water supply & sewerages Value of construction completed in original contract
1997 21Million Won→2007 85Million Won▲ +304.8%
Boring & gronting works Value of construction completed in original contract
1995 341Million Won→2007 87,045Million Won▲ +25426.4%
Total Value of construction completed in subcontract
1994 210,175Million Won→2007 683,966Million Won▲ +225.4%
General construction Value of construction completed in subcontract
1994 202,649Million Won→2007 294,253Million Won▲ +45.2%
Special construction Value of construction completed in subcontract
1994 5,801Million Won→2007 303,608Million Won▲ +5133.7%
Interior architecture works Value of construction completed in subcontract
1994 15Million Won→2007 21,852Million Won▲ +145580.0%
Excavating and earthmoving Value of construction completed in subcontract
1994 9Million Won→2007 32,083Million Won▲ +356377.8%
Plastering waterproofing masonry construction business Value of construction completed in subcontract
1995 1,473Million Won→2007 4,812Million Won▲ +226.7%
Stone works Value of construction completed in subcontract
1995 203Million Won→2007 5,070Million Won▲ +2397.5%
Painting works Value of construction completed in subcontract
1994 1,658Million Won→2007 2,215Million Won▲ +33.6%
Scaffolding demolition works Value of construction completed in subcontract
1994 2,233Million Won→2007 5,727Million Won▲ +156.5%
Metal structure installation and Erection of doors Value of construction completed in subcontract
1996 298Million Won→2007 20,912Million Won▲ +6917.4%
Roofing sheet metal prefabrication Value of construction completed in subcontract
1995 612Million Won→2007 2,284Million Won▲ +273.2%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
1995 863Million Won→2007 26,211Million Won▲ +2937.2%
Water supply & sewerages Value of construction completed in subcontract
1995 203Million Won→2007 4,934Million Won▲ +2330.5%
Boring & gronting works Value of construction completed in subcontract
1994 1,212Million Won→2007 54,405Million Won▲ +4388.9%
Steel frame works Value of construction completed in subcontract
1994 671Million Won→2007 12,367Million Won▲ +1743.1%
Total Value of carry-over work
1994 8,070,631Million Won→2007 41,626,878Million Won▲ +415.8%
General construction Value of carry-over work
1994 7,727,583Million Won→2007 40,767,737Million Won▲ +427.6%
Special construction Value of carry-over work
1994 8,397Million Won→2007 497,406Million Won▲ +5823.6%
Interior architecture works Value of carry-over work
1994 60Million Won→2007 31,998Million Won▲ +53230.0%
Excavating and earthmoving Value of carry-over work
1995 79,152Million Won→2007 54,360Million Won▼ −31.3%
Plastering waterproofing masonry construction business Value of carry-over work
1995 1,374Million Won→2007 806Million Won▼ −41.3%
Painting works Value of carry-over work
1994 11Million Won→2007 108Million Won▲ +881.8%
Scaffolding demolition works Value of carry-over work
1994 4,049Million Won→2007 5,802Million Won▲ +43.3%
Metal structure installation and Erection of doors Value of carry-over work
1994 436Million Won→2007 6,799Million Won▲ +1459.4%
Roofing sheet metal prefabrication Value of carry-over work
1997 125Million Won→2007 2,478Million Won▲ +1882.4%
Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
1995 133Million Won→2007 60,197Million Won▲ +45160.9%
Water supply & sewerages Value of carry-over work
1997 30Million Won→2007 5,775Million Won▲ +19150.0%
Boring & gronting works Value of carry-over work
1994 3,584Million Won→2007 103,560Million Won▲ +2789.5%
Steel frame works Value of carry-over work
1994 255Million Won→2007 21,268Million Won▲ +8240.4%
这项统计是什么
Construction Industry Survey· - 건설업체 → 건설관련기관(6개) → 국가데이터처
- 主要术语
- 为何编制
- 우리나라 건설업부문의 구조 및 산업활동 실태를 파악하여 정책수립에 필요한 기초자료 제공 활용분야 : 건설관련 정책수립, GDP.산업연관표 및 GRDP작성, 월간조사 모집단 자료로 활용
- 调查什么
- 기업체
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자… 展开全文
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자가 발전용으로 사용한 모든 연료의 사용금액과 전기료, 가스료, 수도료 등을 말함급여총액 : 손익계산서의 판매비와 관리비 중 임원급여, 급료와 임금, 제수당 및 상여금, 잡급과 공사원가명세서의 노무비 중 급여, 임금, 제수당, 기타급여를 포함하며, 해외 건설공사의 경우 현지 고용한 외국인 노무자에 대한 급여는 제외함퇴직급여 : 손익계산서 및 공사원가명세서상의 퇴직급여 및 당년도 퇴직급여충당금전입액이 포함복리후생비 : 종업원에 대한 급여 이외의 위생, 보건, 위안, 요양 등 종업원의 복지와 후생을 위하여 지출한 제비용을 말하는데, 장기 결근자에 대한 급여, 양로연금, 종업원 레크레이션을 위한 운동시설, 영화, 여행, 운동회개최 등을 위한 제비용을 포함대손상각비 : 손익계산서상의 대손상각비로서 외상매출금, 받을 어음 등 채권의 추산액 또는 경상적인 대손상각을 말함임차료 : 건설활동을 위하여 제3자로부터 건물, 장비, 토지 등을 임차하였을 경우 그에 대한 임차료를 말함. 해외건설공사의 경우 외국인으로부터 임차한 대가로 지불한 임차료는 제외세금과공과 : 건설업활동과 관련된 각종 세금 및 공과금으로 등록세, 재산세, 취득세, 사업소득세, 자동차세, 협회비 등 공사원가 및 판매비와 관리비 부문에 포함되는 모든 세금과 공과금을 말한다.해외공사의 경우 외국정부 등에 납부한 조세공과는 제외하였으며 기타영업비용에 포함하였다.감가상각비 : 건물, 건설장비 등의 유형고정자산에 대한 감가상각비와 무형자산에 대한 상각비의 합계를 말함외주공사비 : 다른 업체에 하도급을 주었을 경우 하도급 업체에서 시공한 기성 부분에 대하여 지출하였거나 지출하여야 할 외주공사비를 말하며 연차 공사의 경우에는 조사대상 기간에 지출한 금액 또는 지출하여야 할 금액을 말함기타영업비용 : 상기 언급한 [원재료비, 보조재료비, 수선비, 수도광열비, 급여총액, 퇴직급여, 복리후생비, 임차료, 세금과공과, 감가상각비, 대손상각비, 외주공사비]를 제외한 손익계산서 및 공사원가명세서상의 건설 활동을 위하여 지출한 비용의 합계를 말함. 해외 건설공사의 경우에는 외국인에게 지불한 급여 및 임차료, 외국정부에 지출한 조세공과 등을 기타영업비용에 포함시킴부가가치 : 부가가치는 기업이 산업 활동을 한 결과 생산물의 가치 등에 새로 부가한 가치를 의미하며 이 조사의 부가가치는 다음과 같이 구함부가가치 = 급여총액 + 퇴직급여(퇴직급여충당금전입액 포함) + 복리후생비(보험료 포함) + 임차료 + 세금과공과 + 대손상각비 + 건설영업이익 + 납부부가가치세건설공사내역 : 건설공사내역은 조사기준년도에 이룩한 모든 공사를 건별로 계약액, 당년도 기성액 등을 공사종류별, 발주자별 및 공사 지역별로 구분 조사해외공사의 경우 외환금액은 조사기준연도 12. 31. 기준 외환은행 환율에 의한 환산치임계약종류 : 도급방법에 따라 원도급과 하도급으로 구분 조사하였음. 원도급이란 발주자로부터 1차적으로 도급받은 경우이며, 하도급이란 재도급 또는 하청을 말함이 조사에서는 국내 타 건설 업체로부터 도급받은 경우 하도급으로 간주하였으며 국내 건설회사가 아닌 외국건설 회사나 국내 종합무역상사 등에서 하도급 받은 경우에는 원도급으로 하였음. 또한 건설회사의 자기 건설이나 산하기업, 모기업을 위한 직영공사인 경우 원도급으로 하였음.기성액(공사액) : 기성액(공사액)이라 함은 건설업체에서 공사의 완공여부나 대금의 수취여부 등과는 관계없이 당해년도에 시공한 공사액을 말함. 즉, 공사수주금액 중 공사의 일부를 다른 업체에 하도급(원도급자의 외주공사액)을 준 경우에는 원도급자의 기성액에서 제외하였음당해년도 계약액(수주액) : 조사대상 업체가 발주자 또는 원도급자와 조사기준년도에 체결한 공사 계약액의 합계미기성액 : 조사기준년도에 시공하지 못하고 차년도로 이월된 공사액『당년도계약액 및 이월된 공사액 - 당년도 기성액』= 미기성액발주자 : 발주자라 함은 건설공사를 건설업자에게 도급하는 자를 말함. 다만, 수급인으로서 도급받은 건설공사를 하도급하는 자를 제외함도급 : 도급이라 함은 건설공사를 완성할 것을 약정하고, 상대방이 그 일의 결과에 대하여 대가를 지급할 것을 약정하는 계약원도급공사 : 발주자로부터 직접 건설공사를 완성할 것을 약정한 공사하도급공사 : 발주자로부터 건설공사를 도급받은 건설업자로부터 재 도급받은 건설공사를 말함조직형태 : 경영주체인 각 기업체의 법적 조직형태를 말하며 이 조사에서는 회사법인,회사이외의 법인 및 개인의 세 가지 형태로 구분법인 : 상법, 민법, 특별법에 의하여 설립되고 법인 등기를 완료하여 법인격을 취득하고 있는 기업체기술자, 기술공 : 건설공사의 설계 및 시공에 관한 전반적인 감독업무를 수행할 수 있는 자, 또는 전문직기술자가 지시한 작업내용을 원활하게 응용하여 기술공의 업무를 충분히 수행할 수 있는 자피고용자 : 일정한 산출기준에 의하여 임금, 봉급 또는 이에 준하는 형식의 급여를 받고 그 기업체에 고용되어 있는 모든 남여 종업원을 말하는데, 이에는 상용은 물론 임시 및 일용 종업원도 포함시켰음. 그러나 장기결근자(3개월 이상) 및 군복무자 등은 제외하였고, 해외공사의 경우에는 해외에서 근무하는 우리나라 피고용자만 조사하였고 외국에서 현지 고용한 외국인 피고용자는 제외함개인 : 법인체가 아닌 개인소유의 기업체를 말하는 것으로서 여기서는 법인격이 없는 조합과 같은 임의단체도 포함자 본 금 : 조사기준년도 12.31. 현재로 납입이 완료된 자본금 또는 출자금액종사자수 : 종사자라 함은 그 기업체의 공사현장 혹은 사무실 등을 가리지 않고, 조사대상 기간 중 건설업을 위한 업무에 종사한 피고용자수와 사업주 및 무급가족종사자수의 합계상용종사자 : 1년 이상의 고용계약에 의하여 실제의 취업시간에 관계없이 일정한 정액급여를 받는 종사자사무 및 기타 종업원 : 공사현장업무에는 직접 관여하지 않고 관리직, 전문직, 사무직 업무에 종사하는 자와 이들의 보조원 즉 급사, 사환, 수위, 승용차의 운전사 등을 말함기능공 : 건설공사의 시공에 직접 종사하는 자로서 ① 고등학교 졸업자와 ② 6개월 이상 조직적인 기술습득을 요하는 직종에서 1년 이상 경험을 가진 자, 또는 국가에서 공인하는 동등한 자격을 가진 자로서 통칭 숙련공을 말함임시종사자 : 1년 미만의 고용계약에 의하여 취업일수 및 취업시간에 따라 임금을 받는 잡부,인부,단순노무자 등을 포함한 현장근로 종사자사업주 및 무급가족종사자 : 사업주(출자자포함)와 그의 가족으로서 업체의 운영을 위하여 사무 또는 노무에 통상 작업시간의 ⅓ 이상을 종사하되 일정한 봉급이나 임금을 받지 않은 자를 말함. 사업주의 가족이라도 상시 근무에 종사하고 이에 대한 임금 또는 봉급의 형식으로 급여를 받은 자는 피고용자에 포함연간 급여액 : 조사대상기간에 정기 또는 부정기를 가리지 않고 피고용자에게 노무의 대가로 지급된 모든 현금급여,조사기준년도 이전의 급여로서 체불되었던 것을 조사기준년도 중에 지급한 것은 제외하고, 반면에 조사기준년도 중에 지급하여야 할 급여로서 미지급된 것은 포함매 출 액 : 매출액이라 함은 건설업체에서 당년도에 시공한 공사수익금액과 분양금액 등을 포함함. 미완성공사는 공사가 진행된 정도에 따라 수익이 실현된 것으로 봄.단, 공사수주 금액 중 공사의 일부를 다른 업체에 외주를 준 경우에는 제외(건설비용의 외주공사비로 조사)건설비용 : 1년간의 건설공사에 대하여 발생한 비용의 총계를 말함. 즉 건설공사원가명세서상의 경비와 손익계산서상의 판매비와 관리비를 말하는데, 건설업 이외의 타 산업을 겸하는 기업체는 겸업부문의 비용은 제외
🔴 本说明由编制该统计的机构亲自撰写。DATA CLOCK KOREA 未作解释或摘要。 原文为韩文。若加以翻译便不再是机构本人的表述,因此照原样刊载。
数据出处
- 机构
- 국가데이터처
- 统计表
- 산업세분류 및 조직형태별 총괄
- 提供方
- KOSIS 국가통계포털
- 期间
- 1994 ~ 2007
- 获取日期
- 2026-08-29
- 处理方式
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.