Construction Industry Survey (21/49)
KOSIS 调查「Construction Industry Survey」的 1 张统计表、138 个项目,以年度数值与图表呈现。
산업세분류별/종사자규모별 부가가치
回到顶部산업별 건설업 · 종사자규모별 계
- Construction Total
- General construction Total
- Building construction Total
- Residential building construction Total
- Non-residential building construction Total
- Heavy and civil engineering construction Total
- Land subdivision with land improvement Total
- Construction of civil engineering projects Total
- Specialized construction activities Total
- Site preparation and construction of foundation works and structures Total
- Site preparation and related construction Total
- Erecting assembling and framing structural parts and masonry works Total
- Construction of installing building equipment Total
- Construction of installing building equipment Total
- Electrical and communication works Total
- Electrical works Total
- Communication works Total
- Building completion and finishing Total
- Painting papering and finishing carpentry works Total
- Glazing works and joinery installation Total
- Other building completion and finishing Total
- Repair and maintenance works for construction works and supplementary facilities Total
- Repair and maintenance works for construction works and supplementary facilities Total
- Construction Labour cost
- General construction Labour cost
- Building construction Labour cost
- Residential building construction Labour cost
- Non-residential building construction Labour cost
- Heavy and civil engineering construction Labour cost
- Land subdivision with land improvement Labour cost
- Construction of civil engineering projects Labour cost
- Specialized construction activities Labour cost
- Site preparation and construction of foundation works and structures Labour cost
- Site preparation and related construction Labour cost
- Erecting assembling and framing structural parts and masonry works Labour cost
- Construction of installing building equipment Labour cost
- Construction of installing building equipment Labour cost
- Electrical and communication works Labour cost
- Electrical works Labour cost
- Communication works Labour cost
- Building completion and finishing Labour cost
- Painting papering and finishing carpentry works Labour cost
- Glazing works and joinery installation Labour cost
- Other building completion and finishing Labour cost
- Repair and maintenance works for construction works and supplementary facilities Labour cost
- Repair and maintenance works for construction works and supplementary facilities Labour cost
- Construction Cost for welfare work
- General construction Cost for welfare work
- Building construction Cost for welfare work
- Residential building construction Cost for welfare work
- Non-residential building construction Cost for welfare work
- Heavy and civil engineering construction Cost for welfare work
- Land subdivision with land improvement Cost for welfare work
- Construction of civil engineering projects Cost for welfare work
- Specialized construction activities Cost for welfare work
- Site preparation and construction of foundation works and structures Cost for welfare work
- Site preparation and related construction Cost for welfare work
- Erecting assembling and framing structural parts and masonry works Cost for welfare work
- Construction of installing building equipment Cost for welfare work
- Construction of installing building equipment Cost for welfare work
- Electrical and communication works Cost for welfare work
- Electrical works Cost for welfare work
- Communication works Cost for welfare work
- Building completion and finishing Cost for welfare work
- Painting papering and finishing carpentry works Cost for welfare work
- Glazing works and joinery installation Cost for welfare work
- Other building completion and finishing Cost for welfare work
- Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
- Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
- Construction Depreciation
- General construction Depreciation
- Building construction Depreciation
- Residential building construction Depreciation
- Non-residential building construction Depreciation
- Heavy and civil engineering construction Depreciation
- Land subdivision with land improvement Depreciation
- Construction of civil engineering projects Depreciation
- Specialized construction activities Depreciation
- Site preparation and construction of foundation works and structures Depreciation
- Site preparation and related construction Depreciation
- Erecting assembling and framing structural parts and masonry works Depreciation
- Construction of installing building equipment Depreciation
- Construction of installing building equipment Depreciation
- Electrical and communication works Depreciation
- Electrical works Depreciation
- Communication works Depreciation
- Building completion and finishing Depreciation
- Painting papering and finishing carpentry works Depreciation
- Glazing works and joinery installation Depreciation
- Other building completion and finishing Depreciation
- Repair and maintenance works for construction works and supplementary facilities Depreciation
- Repair and maintenance works for construction works and supplementary facilities Depreciation
- Construction Hire
- General construction Hire
- Building construction Hire
- Residential building construction Hire
- Non-residential building construction Hire
- Heavy and civil engineering construction Hire
- Land subdivision with land improvement Hire
- Construction of civil engineering projects Hire
- Specialized construction activities Hire
- Site preparation and construction of foundation works and structures Hire
- Site preparation and related construction Hire
- Erecting assembling and framing structural parts and masonry works Hire
- Construction of installing building equipment Hire
- Construction of installing building equipment Hire
- Electrical and communication works Hire
- Electrical works Hire
- Communication works Hire
- Building completion and finishing Hire
- Painting papering and finishing carpentry works Hire
- Glazing works and joinery installation Hire
- Other building completion and finishing Hire
- Repair and maintenance works for construction works and supplementary facilities Hire
- Repair and maintenance works for construction works and supplementary facilities Hire
- Construction Tax and public dues
- General construction Tax and public dues
- Building construction Tax and public dues
- Residential building construction Tax and public dues
- Non-residential building construction Tax and public dues
- Heavy and civil engineering construction Tax and public dues
- Land subdivision with land improvement Tax and public dues
- Construction of civil engineering projects Tax and public dues
- Specialized construction activities Tax and public dues
- Site preparation and construction of foundation works and structures Tax and public dues
- Site preparation and related construction Tax and public dues
- Erecting assembling and framing structural parts and masonry works Tax and public dues
- Construction of installing building equipment Tax and public dues
- Construction of installing building equipment Tax and public dues
- Electrical and communication works Tax and public dues
- Electrical works Tax and public dues
- Communication works Tax and public dues
- Building completion and finishing Tax and public dues
- Painting papering and finishing carpentry works Tax and public dues
- Glazing works and joinery installation Tax and public dues
- Other building completion and finishing Tax and public dues
- Repair and maintenance works for construction works and supplementary facilities Tax and public dues
- Repair and maintenance works for construction works and supplementary facilities Tax and public dues
Construction Total
2008 72,694,843million won→2023 151,094,082million won▲ +107.8%
General construction Total
2008 33,872,587million won→2023 70,234,908million won▲ +107.4%
Building construction Total
2008 25,099,779million won→2023 54,528,352million won▲ +117.2%
Residential building construction Total
2008 15,853,500million won→2023 25,434,297million won▲ +60.4%
Non-residential building construction Total
2008 9,246,278million won→2023 29,094,056million won▲ +214.7%
Heavy and civil engineering construction Total
2008 8,772,808million won→2023 15,706,555million won▲ +79.0%
Land subdivision with land improvement Total
2008 488,918million won→2023 372,538million won▼ −23.8%
Construction of civil engineering projects Total
2008 8,283,890million won→2023 15,334,018million won▲ +85.1%
Specialized construction activities Total
2008 38,822,255million won→2023 80,859,174million won▲ +108.3%
Site preparation and construction of foundation works and structures Total
2008 15,476,201million won→2023 33,783,186million won▲ +118.3%
Site preparation and related construction Total
2008 4,466,835million won→2023 7,849,490million won▲ +75.7%
Erecting assembling and framing structural parts and masonry works Total
2008 11,009,366million won→2023 25,933,697million won▲ +135.6%
Construction of installing building equipment Total
2008 5,720,013million won→2023 13,657,598million won▲ +138.8%
Construction of installing building equipment Total
2008 5,720,013million won→2023 13,657,598million won▲ +138.8%
Electrical and communication works Total
2008 9,632,641million won→2023 19,245,923million won▲ +99.8%
Electrical works Total
2008 6,830,633million won→2023 14,511,672million won▲ +112.4%
Communication works Total
2008 2,802,008million won→2023 4,734,250million won▲ +69.0%
Building completion and finishing Total
2008 7,471,419million won→2023 14,172,467million won▲ +89.7%
Painting papering and finishing carpentry works Total
2008 3,428,064million won→2023 6,760,880million won▲ +97.2%
Glazing works and joinery installation Total
2008 2,637,559million won→2023 4,552,881million won▲ +72.6%
Other building completion and finishing Total
2008 1,405,795million won→2023 2,858,706million won▲ +103.4%
Repair and maintenance works for construction works and supplementary facilities Total
2008 521,979million won→2022 435,808million won▼ −16.5%
Repair and maintenance works for construction works and supplementary facilities Total
2008 521,979million won→2022 435,808million won▼ −16.5%
Construction Labour cost
2008 39,837,194million won→2023 88,733,469million won▲ +122.7%
General construction Labour cost
2008 15,876,193million won→2023 37,045,413million won▲ +133.3%
Building construction Labour cost
2008 12,025,540million won→2023 28,062,577million won▲ +133.4%
Residential building construction Labour cost
2008 7,373,534million won→2023 11,256,905million won▲ +52.7%
Non-residential building construction Labour cost
2008 4,652,006million won→2023 16,805,673million won▲ +261.3%
Heavy and civil engineering construction Labour cost
2008 3,850,653million won→2023 8,982,836million won▲ +133.3%
Land subdivision with land improvement Labour cost
2008 244,145million won→2023 207,253million won▼ −15.1%
Construction of civil engineering projects Labour cost
2008 3,606,507million won→2023 8,775,582million won▲ +143.3%
Specialized construction activities Labour cost
2008 23,961,001million won→2023 51,688,056million won▲ +115.7%
Site preparation and construction of foundation works and structures Labour cost
2008 9,403,971million won→2023 20,812,307million won▲ +121.3%
Site preparation and related construction Labour cost
2008 2,437,987million won→2023 3,679,069million won▲ +50.9%
Erecting assembling and framing structural parts and masonry works Labour cost
2008 6,965,983million won→2023 17,133,238million won▲ +146.0%
Construction of installing building equipment Labour cost
2008 3,607,731million won→2023 9,240,280million won▲ +156.1%
Construction of installing building equipment Labour cost
2008 3,607,731million won→2023 9,240,280million won▲ +156.1%
Electrical and communication works Labour cost
2008 5,747,962million won→2023 12,319,822million won▲ +114.3%
Electrical works Labour cost
2008 4,029,607million won→2023 9,378,377million won▲ +132.7%
Communication works Labour cost
2008 1,718,354million won→2023 2,941,444million won▲ +71.2%
Building completion and finishing Labour cost
2008 4,875,126million won→2023 9,315,647million won▲ +91.1%
Painting papering and finishing carpentry works Labour cost
2008 2,246,729million won→2023 4,535,486million won▲ +101.9%
Glazing works and joinery installation Labour cost
2008 1,641,448million won→2023 2,715,866million won▲ +65.5%
Other building completion and finishing Labour cost
2008 986,948million won→2023 2,064,296million won▲ +109.2%
Repair and maintenance works for construction works and supplementary facilities Labour cost
2008 326,209million won→2022 263,617million won▼ −19.2%
Repair and maintenance works for construction works and supplementary facilities Labour cost
2008 326,209million won→2022 263,617million won▼ −19.2%
Construction Cost for welfare work
2008 5,110,268million won→2023 14,737,420million won▲ +188.4%
General construction Cost for welfare work
2008 2,317,624million won→2023 7,995,753million won▲ +245.0%
Building construction Cost for welfare work
2008 1,661,635million won→2023 6,432,547million won▲ +287.1%
Residential building construction Cost for welfare work
2008 990,232million won→2023 3,068,287million won▲ +209.9%
Non-residential building construction Cost for welfare work
2008 671,402million won→2023 3,364,260million won▲ +401.1%
Heavy and civil engineering construction Cost for welfare work
2008 655,988million won→2023 1,563,206million won▲ +138.3%
Land subdivision with land improvement Cost for welfare work
2008 36,444million won→2023 36,149million won▼ −0.8%
Construction of civil engineering projects Cost for welfare work
2008 619,544million won→2023 1,527,057million won▲ +146.5%
Specialized construction activities Cost for welfare work
2008 2,792,644million won→2023 6,741,667million won▲ +141.4%
Site preparation and construction of foundation works and structures Cost for welfare work
2008 1,211,769million won→2023 2,613,545million won▲ +115.7%
Site preparation and related construction Cost for welfare work
2008 375,160million won→2023 567,737million won▲ +51.3%
Erecting assembling and framing structural parts and masonry works Cost for welfare work
2008 836,609million won→2023 2,045,807million won▲ +144.5%
Construction of installing building equipment Cost for welfare work
2008 390,471million won→2023 1,242,443million won▲ +218.2%
Construction of installing building equipment Cost for welfare work
2008 390,471million won→2023 1,242,443million won▲ +218.2%
Electrical and communication works Cost for welfare work
2008 630,578million won→2023 1,758,953million won▲ +178.9%
Electrical works Cost for welfare work
2008 450,316million won→2023 1,348,679million won▲ +199.5%
Communication works Cost for welfare work
2008 180,262million won→2023 410,274million won▲ +127.6%
Building completion and finishing Cost for welfare work
2008 528,177million won→2023 1,126,726million won▲ +113.3%
Painting papering and finishing carpentry works Cost for welfare work
2008 240,940million won→2023 546,291million won▲ +126.7%
Glazing works and joinery installation Cost for welfare work
2008 186,584million won→2023 354,427million won▲ +90.0%
Other building completion and finishing Cost for welfare work
2008 100,652million won→2023 226,008million won▲ +124.5%
Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
2008 31,647million won→2022 36,643million won▲ +15.8%
Repair and maintenance works for construction works and supplementary facilities Cost for welfare work
2008 31,647million won→2022 36,643million won▲ +15.8%
Construction Depreciation
2008 1,495,776million won→2023 3,450,554million won▲ +130.7%
General construction Depreciation
2008 618,770million won→2023 1,790,596million won▲ +189.4%
Building construction Depreciation
2008 337,568million won→2023 1,420,527million won▲ +320.8%
Residential building construction Depreciation
2008 161,132million won→2023 719,478million won▲ +346.5%
Non-residential building construction Depreciation
2008 176,435million won→2023 701,049million won▲ +297.3%
Heavy and civil engineering construction Depreciation
2008 281,202million won→2023 370,069million won▲ +31.6%
Land subdivision with land improvement Depreciation
2008 8,690million won→2023 7,050million won▼ −18.9%
Construction of civil engineering projects Depreciation
2008 272,511million won→2023 363,019million won▲ +33.2%
Specialized construction activities Depreciation
2008 877,006million won→2023 1,659,958million won▲ +89.3%
Site preparation and construction of foundation works and structures Depreciation
2008 374,719million won→2023 581,128million won▲ +55.1%
Site preparation and related construction Depreciation
2008 120,124million won→2023 159,597million won▲ +32.9%
Erecting assembling and framing structural parts and masonry works Depreciation
2008 254,595million won→2023 421,531million won▲ +65.6%
Construction of installing building equipment Depreciation
2008 107,549million won→2023 254,904million won▲ +137.0%
Construction of installing building equipment Depreciation
2008 107,549million won→2023 254,904million won▲ +137.0%
Electrical and communication works Depreciation
2008 240,271million won→2023 563,599million won▲ +134.6%
Electrical works Depreciation
2008 132,311million won→2023 386,403million won▲ +192.0%
Communication works Depreciation
2008 107,960million won→2023 177,196million won▲ +64.1%
Building completion and finishing Depreciation
2008 146,570million won→2023 260,326million won▲ +77.6%
Painting papering and finishing carpentry works Depreciation
2008 63,423million won→2023 108,485million won▲ +71.0%
Glazing works and joinery installation Depreciation
2008 63,366million won→2023 116,076million won▲ +83.2%
Other building completion and finishing Depreciation
2008 19,780million won→2023 35,765million won▲ +80.8%
Repair and maintenance works for construction works and supplementary facilities Depreciation
2008 7,894million won→2022 9,681million won▲ +22.6%
Repair and maintenance works for construction works and supplementary facilities Depreciation
2008 7,894million won→2022 9,681million won▲ +22.6%
Construction Hire
2008 4,627,697million won→2023 11,841,021million won▲ +155.9%
General construction Hire
2008 2,341,237million won→2023 4,040,253million won▲ +72.6%
Building construction Hire
2008 1,875,148million won→2023 2,968,429million won▲ +58.3%
Residential building construction Hire
2008 1,353,510million won→2023 1,218,545million won▼ −10.0%
Non-residential building construction Hire
2008 521,638million won→2023 1,749,884million won▲ +235.5%
Heavy and civil engineering construction Hire
2008 466,088million won→2023 1,071,825million won▲ +130.0%
Land subdivision with land improvement Hire
2008 24,212million won→2023 49,048million won▲ +102.6%
Construction of civil engineering projects Hire
2008 441,875million won→2023 1,022,776million won▲ +131.5%
Specialized construction activities Hire
2008 2,286,460million won→2023 7,800,768million won▲ +241.2%
Site preparation and construction of foundation works and structures Hire
2008 1,442,540million won→2023 5,512,556million won▲ +282.1%
Site preparation and related construction Hire
2008 609,809million won→2023 2,481,013million won▲ +306.9%
Erecting assembling and framing structural parts and masonry works Hire
2008 832,730million won→2023 3,031,543million won▲ +264.0%
Construction of installing building equipment Hire
2008 235,837million won→2023 631,186million won▲ +167.6%
Construction of installing building equipment Hire
2008 235,837million won→2023 631,186million won▲ +167.6%
Electrical and communication works Hire
2008 299,274million won→2023 575,051million won▲ +92.1%
Electrical works Hire
2008 228,974million won→2023 447,089million won▲ +95.3%
Communication works Hire
2008 70,300million won→2023 127,963million won▲ +82.0%
Building completion and finishing Hire
2008 285,892million won→2023 1,081,974million won▲ +278.5%
Painting papering and finishing carpentry works Hire
2008 132,858million won→2023 480,897million won▲ +262.0%
Glazing works and joinery installation Hire
2008 107,921million won→2023 384,587million won▲ +256.4%
Other building completion and finishing Hire
2008 45,112million won→2023 216,491million won▲ +379.9%
Repair and maintenance works for construction works and supplementary facilities Hire
2008 22,915million won→2022 25,516million won▲ +11.4%
Repair and maintenance works for construction works and supplementary facilities Hire
2008 22,915million won→2022 25,516million won▲ +11.4%
Construction Tax and public dues
2008 1,796,351million won→2023 4,725,281million won▲ +163.0%
General construction Tax and public dues
2008 1,222,331million won→2023 3,084,238million won▲ +152.3%
Building construction Tax and public dues
2008 996,888million won→2023 2,730,107million won▲ +173.9%
Residential building construction Tax and public dues
2008 762,730million won→2023 1,803,652million won▲ +136.5%
Non-residential building construction Tax and public dues
2008 234,157million won→2023 926,455million won▲ +295.7%
Heavy and civil engineering construction Tax and public dues
2008 225,443million won→2023 354,131million won▲ +57.1%
Land subdivision with land improvement Tax and public dues
2008 12,251million won→2023 5,707million won▼ −53.4%
Construction of civil engineering projects Tax and public dues
2008 213,191million won→2023 348,424million won▲ +63.4%
Specialized construction activities Tax and public dues
2008 574,020million won→2023 1,641,043million won▲ +185.9%
Site preparation and construction of foundation works and structures Tax and public dues
2008 206,938million won→2023 646,803million won▲ +212.6%
Site preparation and related construction Tax and public dues
2008 60,562million won→2023 130,029million won▲ +114.7%
Erecting assembling and framing structural parts and masonry works Tax and public dues
2008 146,375million won→2023 516,774million won▲ +253.0%
Construction of installing building equipment Tax and public dues
2008 80,824million won→2023 318,441million won▲ +294.0%
Construction of installing building equipment Tax and public dues
2008 80,824million won→2023 318,441million won▲ +294.0%
Electrical and communication works Tax and public dues
2008 161,969million won→2023 407,435million won▲ +151.6%
Electrical works Tax and public dues
2008 111,541million won→2023 306,517million won▲ +174.8%
Communication works Tax and public dues
2008 50,428million won→2023 100,918million won▲ +100.1%
Building completion and finishing Tax and public dues
2008 116,144million won→2023 268,364million won▲ +131.1%
Painting papering and finishing carpentry works Tax and public dues
2008 58,011million won→2023 130,552million won▲ +125.0%
Glazing works and joinery installation Tax and public dues
2008 44,848million won→2023 88,166million won▲ +96.6%
Other building completion and finishing Tax and public dues
2008 13,285million won→2023 49,646million won▲ +273.7%
Repair and maintenance works for construction works and supplementary facilities Tax and public dues
2008 8,142million won→2022 7,541million won▼ −7.4%
Repair and maintenance works for construction works and supplementary facilities Tax and public dues
2008 8,142million won→2022 7,541million won▼ −7.4%
这项统计是什么
Construction Industry Survey· - 건설업체 → 건설관련기관(6개) → 국가데이터처
- 主要术语
- 为何编制
- 우리나라 건설업부문의 구조 및 산업활동 실태를 파악하여 정책수립에 필요한 기초자료 제공 활용분야 : 건설관련 정책수립, GDP.산업연관표 및 GRDP작성, 월간조사 모집단 자료로 활용
- 调查什么
- 기업체
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자… 展开全文
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자가 발전용으로 사용한 모든 연료의 사용금액과 전기료, 가스료, 수도료 등을 말함급여총액 : 손익계산서의 판매비와 관리비 중 임원급여, 급료와 임금, 제수당 및 상여금, 잡급과 공사원가명세서의 노무비 중 급여, 임금, 제수당, 기타급여를 포함하며, 해외 건설공사의 경우 현지 고용한 외국인 노무자에 대한 급여는 제외함퇴직급여 : 손익계산서 및 공사원가명세서상의 퇴직급여 및 당년도 퇴직급여충당금전입액이 포함복리후생비 : 종업원에 대한 급여 이외의 위생, 보건, 위안, 요양 등 종업원의 복지와 후생을 위하여 지출한 제비용을 말하는데, 장기 결근자에 대한 급여, 양로연금, 종업원 레크레이션을 위한 운동시설, 영화, 여행, 운동회개최 등을 위한 제비용을 포함대손상각비 : 손익계산서상의 대손상각비로서 외상매출금, 받을 어음 등 채권의 추산액 또는 경상적인 대손상각을 말함임차료 : 건설활동을 위하여 제3자로부터 건물, 장비, 토지 등을 임차하였을 경우 그에 대한 임차료를 말함. 해외건설공사의 경우 외국인으로부터 임차한 대가로 지불한 임차료는 제외세금과공과 : 건설업활동과 관련된 각종 세금 및 공과금으로 등록세, 재산세, 취득세, 사업소득세, 자동차세, 협회비 등 공사원가 및 판매비와 관리비 부문에 포함되는 모든 세금과 공과금을 말한다.해외공사의 경우 외국정부 등에 납부한 조세공과는 제외하였으며 기타영업비용에 포함하였다.감가상각비 : 건물, 건설장비 등의 유형고정자산에 대한 감가상각비와 무형자산에 대한 상각비의 합계를 말함외주공사비 : 다른 업체에 하도급을 주었을 경우 하도급 업체에서 시공한 기성 부분에 대하여 지출하였거나 지출하여야 할 외주공사비를 말하며 연차 공사의 경우에는 조사대상 기간에 지출한 금액 또는 지출하여야 할 금액을 말함기타영업비용 : 상기 언급한 [원재료비, 보조재료비, 수선비, 수도광열비, 급여총액, 퇴직급여, 복리후생비, 임차료, 세금과공과, 감가상각비, 대손상각비, 외주공사비]를 제외한 손익계산서 및 공사원가명세서상의 건설 활동을 위하여 지출한 비용의 합계를 말함. 해외 건설공사의 경우에는 외국인에게 지불한 급여 및 임차료, 외국정부에 지출한 조세공과 등을 기타영업비용에 포함시킴부가가치 : 부가가치는 기업이 산업 활동을 한 결과 생산물의 가치 등에 새로 부가한 가치를 의미하며 이 조사의 부가가치는 다음과 같이 구함부가가치 = 급여총액 + 퇴직급여(퇴직급여충당금전입액 포함) + 복리후생비(보험료 포함) + 임차료 + 세금과공과 + 대손상각비 + 건설영업이익 + 납부부가가치세건설공사내역 : 건설공사내역은 조사기준년도에 이룩한 모든 공사를 건별로 계약액, 당년도 기성액 등을 공사종류별, 발주자별 및 공사 지역별로 구분 조사해외공사의 경우 외환금액은 조사기준연도 12. 31. 기준 외환은행 환율에 의한 환산치임계약종류 : 도급방법에 따라 원도급과 하도급으로 구분 조사하였음. 원도급이란 발주자로부터 1차적으로 도급받은 경우이며, 하도급이란 재도급 또는 하청을 말함이 조사에서는 국내 타 건설 업체로부터 도급받은 경우 하도급으로 간주하였으며 국내 건설회사가 아닌 외국건설 회사나 국내 종합무역상사 등에서 하도급 받은 경우에는 원도급으로 하였음. 또한 건설회사의 자기 건설이나 산하기업, 모기업을 위한 직영공사인 경우 원도급으로 하였음.기성액(공사액) : 기성액(공사액)이라 함은 건설업체에서 공사의 완공여부나 대금의 수취여부 등과는 관계없이 당해년도에 시공한 공사액을 말함. 즉, 공사수주금액 중 공사의 일부를 다른 업체에 하도급(원도급자의 외주공사액)을 준 경우에는 원도급자의 기성액에서 제외하였음당해년도 계약액(수주액) : 조사대상 업체가 발주자 또는 원도급자와 조사기준년도에 체결한 공사 계약액의 합계미기성액 : 조사기준년도에 시공하지 못하고 차년도로 이월된 공사액『당년도계약액 및 이월된 공사액 - 당년도 기성액』= 미기성액발주자 : 발주자라 함은 건설공사를 건설업자에게 도급하는 자를 말함. 다만, 수급인으로서 도급받은 건설공사를 하도급하는 자를 제외함도급 : 도급이라 함은 건설공사를 완성할 것을 약정하고, 상대방이 그 일의 결과에 대하여 대가를 지급할 것을 약정하는 계약원도급공사 : 발주자로부터 직접 건설공사를 완성할 것을 약정한 공사하도급공사 : 발주자로부터 건설공사를 도급받은 건설업자로부터 재 도급받은 건설공사를 말함조직형태 : 경영주체인 각 기업체의 법적 조직형태를 말하며 이 조사에서는 회사법인,회사이외의 법인 및 개인의 세 가지 형태로 구분법인 : 상법, 민법, 특별법에 의하여 설립되고 법인 등기를 완료하여 법인격을 취득하고 있는 기업체기술자, 기술공 : 건설공사의 설계 및 시공에 관한 전반적인 감독업무를 수행할 수 있는 자, 또는 전문직기술자가 지시한 작업내용을 원활하게 응용하여 기술공의 업무를 충분히 수행할 수 있는 자피고용자 : 일정한 산출기준에 의하여 임금, 봉급 또는 이에 준하는 형식의 급여를 받고 그 기업체에 고용되어 있는 모든 남여 종업원을 말하는데, 이에는 상용은 물론 임시 및 일용 종업원도 포함시켰음. 그러나 장기결근자(3개월 이상) 및 군복무자 등은 제외하였고, 해외공사의 경우에는 해외에서 근무하는 우리나라 피고용자만 조사하였고 외국에서 현지 고용한 외국인 피고용자는 제외함개인 : 법인체가 아닌 개인소유의 기업체를 말하는 것으로서 여기서는 법인격이 없는 조합과 같은 임의단체도 포함자 본 금 : 조사기준년도 12.31. 현재로 납입이 완료된 자본금 또는 출자금액종사자수 : 종사자라 함은 그 기업체의 공사현장 혹은 사무실 등을 가리지 않고, 조사대상 기간 중 건설업을 위한 업무에 종사한 피고용자수와 사업주 및 무급가족종사자수의 합계상용종사자 : 1년 이상의 고용계약에 의하여 실제의 취업시간에 관계없이 일정한 정액급여를 받는 종사자사무 및 기타 종업원 : 공사현장업무에는 직접 관여하지 않고 관리직, 전문직, 사무직 업무에 종사하는 자와 이들의 보조원 즉 급사, 사환, 수위, 승용차의 운전사 등을 말함기능공 : 건설공사의 시공에 직접 종사하는 자로서 ① 고등학교 졸업자와 ② 6개월 이상 조직적인 기술습득을 요하는 직종에서 1년 이상 경험을 가진 자, 또는 국가에서 공인하는 동등한 자격을 가진 자로서 통칭 숙련공을 말함임시종사자 : 1년 미만의 고용계약에 의하여 취업일수 및 취업시간에 따라 임금을 받는 잡부,인부,단순노무자 등을 포함한 현장근로 종사자사업주 및 무급가족종사자 : 사업주(출자자포함)와 그의 가족으로서 업체의 운영을 위하여 사무 또는 노무에 통상 작업시간의 ⅓ 이상을 종사하되 일정한 봉급이나 임금을 받지 않은 자를 말함. 사업주의 가족이라도 상시 근무에 종사하고 이에 대한 임금 또는 봉급의 형식으로 급여를 받은 자는 피고용자에 포함연간 급여액 : 조사대상기간에 정기 또는 부정기를 가리지 않고 피고용자에게 노무의 대가로 지급된 모든 현금급여,조사기준년도 이전의 급여로서 체불되었던 것을 조사기준년도 중에 지급한 것은 제외하고, 반면에 조사기준년도 중에 지급하여야 할 급여로서 미지급된 것은 포함매 출 액 : 매출액이라 함은 건설업체에서 당년도에 시공한 공사수익금액과 분양금액 등을 포함함. 미완성공사는 공사가 진행된 정도에 따라 수익이 실현된 것으로 봄.단, 공사수주 금액 중 공사의 일부를 다른 업체에 외주를 준 경우에는 제외(건설비용의 외주공사비로 조사)건설비용 : 1년간의 건설공사에 대하여 발생한 비용의 총계를 말함. 즉 건설공사원가명세서상의 경비와 손익계산서상의 판매비와 관리비를 말하는데, 건설업 이외의 타 산업을 겸하는 기업체는 겸업부문의 비용은 제외
🔴 本说明由编制该统计的机构亲自撰写。DATA CLOCK KOREA 未作解释或摘要。 原文为韩文。若加以翻译便不再是机构本人的表述,因此照原样刊载。
数据出处
- 机构
- 국가데이터처
- 统计表
- 산업세분류 및 조직형태별 총괄
- 提供方
- KOSIS 국가통계포털
- 期间
- 2008 ~ 2023
- 获取日期
- 2026-08-29
- 处理方式
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.